"PROFECTION" Recommended. Sequence of replacing an old window with a new one.

№2

1. First, measure at least twice from the edge of the existing horizontal and vertical frames of the window.

2. Next, loosen the vents

3. Release the old window glass package.

4. Saw the main nose * and remove the rest with a piece of glue.

5. Remove the installation window vents and windshield wipers and prepare to secure the main frame.

6. Attach the window to the building wall at a distance of 15 cm from the corner and 70 cm from the main part.

7. When attaching the window to the building wall, fasten it with a 6 mm drill bit.

8. After fixing the outer frame of the window, make sure that it is evenly spaced vertically and horizontally

9. Prepare window concrete for the wall by drilling a 5.5 mm hole.

10. Drill only the upper part of the 6 mm pre-drilled window frame with a 12 mm drill.

11. When fixing the window vertically, make a hole in the brick of the back wall. Make sure that the screw does not fit between the bricks

12. When attaching a window to a wall, first fasten the top and bottom to the building wall.

13. Cover the hole drilled in the window frame with a special lid.

14. After installing the ventilator, fix the glass cover with silicone vertically and horizontally.

15. To install the glass package, gently tap the bottom of the glass with a rubber mallet and push it against the back frame

16. To install the glass press, gently tap it with a rubber mallet

17. The main sequence of glass packages shall be siliconeized so that the glass packages are evenly spaced horizontally and vertically.

18. After determining the glass patronage, specify the glass package.

19. When placing the glass package, press the glass clamp with a rubber mallet.

20. Fill the 1 cm space between the outer window frame and the building wall with special foam

21. Finally, each corner of the window and each part relative to the wall should be sealed on the inside and outside.